Skip to main content

Operations · Path

Operational Waste Audit

Track interruptions and unplanned work for one week, categorize where capacity is being lost, and test fixes for the two biggest waste sources.

Impact

Make wasted capacity visible, rank the biggest interruption sources, and test two fixes before adding more people or tools.

Expected change

You should know which two waste categories consume the most time and what concrete fixes are being tested to reduce them.

Duration

7 days

Steps

For five workdays, log every interruption and unplanned task by person or workstream, including requester, time spent, and planned work delayed.

Why this mattersInterruptions feel normal when they are scattered through the week. Logging turns them into a capacity number.

  • What to do
  • Input
  • Output
  • Done when
  • Common pitfalls

The remaining steps are part of the paid plan.

Start the free read

The path is done when: Done when one week of interruption data is categorized, total hours are ranked by waste category, and two fixes have owners and a 14-day trial period.

If ignored

If waste stays unmeasured, the business can add headcount or tools while the same interruptions keep consuming the new capacity.

Start the free read

References

Eric Ries, The Lean Startup, 2011

Eliyahu Goldratt & Jeff Cox, The Goal, 1984