Operations · Path
Operational Waste Audit
Track interruptions and unplanned work for one week, categorize where capacity is being lost, and test fixes for the two biggest waste sources.
Impact
Make wasted capacity visible, rank the biggest interruption sources, and test two fixes before adding more people or tools.
Expected change
You should know which two waste categories consume the most time and what concrete fixes are being tested to reduce them.
Duration
7 days
Steps
For five workdays, log every interruption and unplanned task by person or workstream, including requester, time spent, and planned work delayed.
Why this mattersInterruptions feel normal when they are scattered through the week. Logging turns them into a capacity number.
- What to do
- Input
- Output
- Done when
- Common pitfalls
The remaining steps are part of the paid plan.
Start the free readThe path is done when: Done when one week of interruption data is categorized, total hours are ranked by waste category, and two fixes have owners and a 14-day trial period.
If ignored
If waste stays unmeasured, the business can add headcount or tools while the same interruptions keep consuming the new capacity.
References
Eric Ries, The Lean Startup, 2011
Eliyahu Goldratt & Jeff Cox, The Goal, 1984