Constraint Relief (4 Weeks)
Find the workflow constraint that is limiting throughput, cap active work around it, and run a weekly fix loop until flow stabilizes. The goal is not more volume; it is fewer stalled handoffs, less rework, and a constraint that has a named owner and review rhythm.
Impact
Identify the single bottleneck limiting output, protect it with a temporary work-in-progress limit, and run a weekly fix loop until flow and rework stabilize.
Expected change
You should have one named operational constraint, a visible work-in-progress limit, and a weekly review loop that produces specific fixes instead of more talk about the problem.
Duration
4 weeks
Steps
Map the live workflow from intake to delivery and mark the step where work waits longest or comes back for rework. Done when: one bottleneck is named with evidence from this week.
Why this mattersReactive work can look like many separate problems while one overloaded step limits throughput. Naming the constraint turns scattered delays into a single place to protect.
- What to do
- Input
- Output
- Done when
- Common pitfalls
The remaining steps are part of the paid plan.
Start the free readThe path is done when: The overloaded stage is written down with its evidence, the limit on open jobs there and the exception rule are in use, four weekly reviews each produced one fix with a person and a due date, and you have written 'more work: yes' or 'not yet' from your two weekly numbers.
If ignored
If an overloaded stage stays unmanaged, new work keeps piling into the same narrow point. Delays, rework, and owner intervention become the operating system instead of exceptions.
References
Eliyahu Goldratt & Jeff Cox, The Goal, 1984
AXELOS, ITIL 4 Foundation, 2019